Redevelopment of the Bouchet School Complex in Bonneville
-
Site planN -
Axonometric view -
Ground floor plan -
First floor plan -
Second floor plan -
Cross section -
south elevation -
deconstruction axonometric view -
construction axonometric view -
Detail axonometric view
Project description
The major restructuring of this ordinary modern heritage asset reveals its potential for transformation. Built in the 1960s, the buildings are based on a regular reinforced concrete structure. Without insulation and altered by successive additions, they had become dysfunctional. Following strip-out, asbestos removal, partial deconstruction and strengthening of the existing structures, the project consists of a timber-frame vertical extension and addition, provided with a high‑performance thermal envelope. Two new covered playgrounds, positioned perpendicular to the main building, redefine the schoolyards.
Project details
- Address96 rue du comte vert, Bonneville, Haute-Savoie
- Dates2022-2025
- Programme5 kindergarten classes, 6 elementary classes
- Surface area2,707 m2
- Budget6.5 M€
- Regulatory frameworkRT Existant – 70 %
- Carbon emissions1,100 kgCO2eq/m2
- Energy consumption38 kWh/m2/year
- LabelsBâtiment biosourcé niveau 3
- Notable detailsTimber-frame extension, wood-fibre insulation, dry screed, thermodynamic air handling unit
Credits
- ClientMairie de Bonneville
- Lead architectTectoniques (architect)
- Project managementTectoniques Ingénieurs (cost consultant, MEP engineering, timber structure, concrete structure, construction scheduling and coordination), eEgenie (sustainability consultant), Alp'VRD (roads and utilities)
- PhotographyPierrick Durand-Glouchkoff