Redevelopment of the Bouchet School Complex in Bonneville
The major restructuring of this ordinary modern heritage asset reveals its potential for transformation. Built in the 1960s, the buildings are based on a regular reinforced concrete structure. Without insulation and altered by successive additions, they had become dysfunctional. Following strip-out, asbestos removal, partial deconstruction and strengthening of the existing structures, the project consists of a timber-frame vertical extension and addition, provided with a high‑performance thermal envelope. Two new covered playgrounds, positioned perpendicular to the main building, redefine the schoolyards.
-

Site plan
N -

Axonometric view
-

Deconstruction axonometric view
-

Construction axonometric view
-

Ground floor plan
-

First floor plan
-

Second floor plan
-

Cross section
-

South elevation
-

Detail axonometric view
Project details
- Address96 rue du comte vert, Bonneville, Haute-Savoie
- Dates2022-2025
- Programme5 nursery classes, 6 elementary classes
- Surface area2,707 m2
- Budget6.5 M€
- Regulatory frameworkRT Existant – 70 %
- Carbon emissions1,100 kgCO2eq/m2
- Energy consumption38 kWh/m2/year
- LabelsBâtiment biosourcé niveau 3
- Notable detailsTimber-frame extension, wood wool insulation, dry screed, thermodynamic air handling unit
Credits
- ClientMairie de Bonneville
- Project managementTectoniques (architect, lead), Tectoniques Ingénieurs (cost consultant, MEP engineering, timber structure, concrete structure, construction scheduling and coordination), eEgenie (sustainability consultant), Alp'VRD (roads and utilities)
- PhotographyPierrick Durand-Glouchkoff, Tectoniques