48 dwellings, student residence and Frida Kahlo school complex in Bordeaux
Block 8.10 is located in the Armagnac Sud district of Bordeaux Euratlantique. It combines a School complex, housing and a student residence in a layout that organises public openness towards the park and residential privacy. Planting extends into the heart of the block and onto the roofs, forming a continuous landscape. The architecture addresses the mixed programme through a unified grid and largely prefabricated construction systems.

Site plan
N
Axonometric view

Ground floor plan

1st floor plan

2nd floor plan

6th floor plan

East elevation

West elevation

North elevation

South elevation

Housing detail axonometric view

School building detail axonometric view
Project details
- Address26 rue Célestin Freinet, Bordeaux, Gironde
- DatesUnder construction since 2025
- Programme48 dwellings, 182 student rooms, 20-class school complex, restaurant, sports hub
- Surface area12,840 m2
- Budget25 M€
- Regulatory frameworkRE 2020 niveau 2025 – Cep – 30 %
- LabelsNF HQE Habitat 9*, Bâtiment frugal bordelais 2 feuilles
- Notable detailsPhotovoltaic panels, bio-based insulation, low-carbon concrete, retention roof, timber structure and timber frame façade for the facility
Credits
- ClientBouygues Immobilier
- Project managementTectoniques (architect), Cobe (Construction scheduling and coordination, works execution management for housing), Land'act (landscape architect), Premières Bases (timber structure), Egis (Complete construction design phases), Passivea (sustainability consultant), Oteis (Building services – construction phase), Aïda (acoustic consultant), Cuisinorme (kitchen designer)