Renovation and Extension of the Mogets School Complex in Loisin
Project details
- Address9 impasse de la prairie, Loisin, Haute-Savoie
- DatesOngoing since 2023
- Programme7 classrooms, extracurricular space, kitchen, cafeteria
- Surface area2,875 m2
- Budget3.7 M€
- Regulatory frameworkRE 2020 niveau 2028 – Cep – 20 %
- Energy consumption72.5 kWh/m2/year
- LabelsBâtiment biosourcé niveau 3
- Notable detailsHeat pump, photovoltaic, pellet boiler, wood wool insulation
Credits
- ClientCommune de Loisin
- Lead architectTectoniques (architect)
- Project managementTectoniques Ingénieurs (cost consultant, electrical engineering, MEP engineering, sustainability consultant, timber structure, concrete structure), LJN (landscape architect), Gamba (acoustic consultant), Studis (kitchen designer, roads and utilities, Fire Safety Systems)